Installation of the Month (May 2021): LADOT Lot 656

< Back
May 18, 2021
June 30, 2023
9:30 pm
2:35 pm
Electric Car Charging

Installation of the Month (May 2021): LADOT Lot 656

The Los Angeles Department of Transportation (LADOT) notes on its website that ICE vehicles are one of the city’s top contributors to air pollution, accounting for 19% of all greenhouse gas emissions, before proclaiming, “We can do better… We’re investing in public transit, testing new technology, and adopting mobility innovations for a cleaner environment and brighter future.” At first, it might just sound like flowery rhetoric, but we can personally attest to that commitment. Starting in 2019, LADOT partnered with us to install DCFCs at 57 city-owned lots, with almost 30% of those installations now completed. This alliance has been integral in promoting our goal of zero-emission mobility in the City of Angels by facilitating greater access to infrastructure.

EVCS CEO Gustavo Occhiuzzo on site at Lot 656

It’s because of this commitment to a sustainable future – including steps taken to electrify their entire bus fleet and advance traffic reduction measures – that we make LADOT’s City Lot 656 our featured site for May. The address is 1615 Colby Avenue in West Los Angeles and can be seen here:

https://www.google.com/maps/place/1615+Colby+Ave,+Los+Angeles,+CA+90025/@34.044509,-118.4549527,17z/data=!3m1!4b1!4m5!3m4!1s0x80c2bb6fc79226a1:0xb463ee8ffb007c9b!8m2!3d34.044509!4d-118.452764

The lot is conveniently situated near the 405 and 10 freeways in close proximity to the main UCLA campus and is walking distance from Sawtelle Japantown’s many distinct restaurants, salons, anime shops and artisan craft stores. Nearby attractions include The Getty Museum, Los Angeles National Cemetery and Mildred E. Mathias Botanical Garden. More about LADOT’s parking facilities and initiatives can be found on their website:

https://ladot.lacity.org/projects/parking-la

At Lot 656, we put four shiny new DC fast chargers in the ground, all with their own dedicated parking spots solely for EVs. These 50 kW Slim Lines feature 480 VAC three-phase input power, 6000 VAC surge protection, and an over 90% efficiency rating that will charge an EV battery to better than 80% in just one hour. The total cost of the installation, including site assessments, permitting, trenching and electrical work, ran about $400,000 and took a year to complete; however, as technology improves, demand increases and red tape is trimmed, market forces will continue to drive down costs and installation times will shrink.

According to clean energy advocacy group RMI, the cost of hardware components is already dropping as manufacturers streamline their internal processes; rather, soft costs associated with municipal and governmental regulations offer the greatest obstacle to cheaper installations. A report by Chris Nelder that RMI published in 2019 titled “Reducing EV Charging Infrastructure Costs” notes, “the costs of permitting delays, utility interconnection requests, [and] compliance with a balkanized framework of regulations… were frequently cited as more significant cost drivers than charging station hardware in the United States.”

However, LADOT’s enthusiasm in joining with EVCS to chart a path toward greater EV adoption offered us the opportunity to work with them on many of these issues, not only to eventually improve the entire installation process for all LA-based site hosts, but to serve as a national leader for other cities to emulate. Our hope is that such frank conversations will encourage more overall participation by speeding up permitting requests, simplifying regulations and allowing for more efficient allocation of public funding that makes the installation process shorter and less burdensome to site hosts.

For now, we’re just happy to be installing more chargers. City Lot 656 is one small example of what a private/public partnership can accomplish when all goals are aligned. Thank you again to the City of LA and its Department of Transportation for helping us pave new roads to the future!

Back
31
May
/
22
30
June
/
23
Electric Car Charging

6 Reasons Why Fast Charging is Critical

EVCS Level 3 chargers are capable of charging an EV battery to 80% capacity within 20 minutes on most vehicles. They are sleek, efficient, convenient, work with any EV, can function in myriad conditions, and are connected by a powerful network with an easy-to-use interface. By all measures, Level 3 charging – or fast charging – is not only an important link in the electric mobility chain as society transitions away from fossil fuels but a critical one to the goal of mass EV adoption.

READ MORE
23
Mar
/
22
30
June
/
23
Electric Car Charging

Catering to Niche Markets

EV drivers are as unique as the cars they own. All have special reasons why electric mobility is the sensible choice for them. In that vein, we recognize that building a massive new EV network is not a one-size-fits all strategy, but one that takes into account the needs of niche groups across the country. Below is just a smattering of the smaller market subsets we have in mind as we aim to make the transition to electric feel more personal and individualistic based on things like interests, jobs, and locale.

READ MORE
6
Mar
/
22
30
June
/
23
Electric Car Charging

How the Ukrainian Crisis Could Affect the EV Market

As the conflict in Ukraine continues to escalate, concerns over how a prolonged incursion may affect global markets has become a frequent topic of discussion, even as major world powers issue a raft of sanctions against Russia in an effort to end the conflict sooner. There are certain to be ramifications for the EV industry specifically as a consequence of the dispute, some of which we’re already starting to see, although their duration and severity are still in question. Here are some of the most prominent.

READ MORE
2
Mar
/
22
30
June
/
23
Electric Car Charging

How EVCS is Helping Change America’s EV Charging Experience

As most of us know, Congress recently approved $7.5 billion in spending for new EV charging installations as part of the larger infrastructure bill, which we expect will help facilitate a speedier transition away from fossil fuels. Even with EV sales increasing in recent years, reports suggest that 25 percent of all carbon emissions still come from the tailpipe, so anything the government can do to kick things up a notch is surely welcome. However, even with such a sizable investment, many challenges still exist that network operators like EVCS will have to help overcome. In a recent article on TheVerge.com, several prescient examples were cited of core areas to focus on if we want to make mass EV adoption a reality. Below are a few such areas and how EVCS is addressing them.

READ MORE
20
Feb
/
22
30
June
/
23
Electric Car Charging

Installation of the Month (February 2022): Sierra Commons Shopping Plaza

The next stage in the evolution of EV charging will be a network operator’s ability to target consumers with advertising and media content pertinent to their demographic. Our recent partnership with minority-owned iKahan Media has afforded us just that opportunity, allowing for the expansion and creation of “a digital billboard network combining EVCS chargers with state-of-the-art LED screens,” as reported last year in a release on PR Newswire. (You can read that entire piece here) Such an initiative is intended to improve the economics of public charging by generating an additional revenue stream for both us and site hosts, providing advertisers with a select new platform for reaching consumers, and increasing value for EV drivers who want to see content that’s relevant to them.

READ MORE